상단메뉴 바로가기 본문 바로가기 본문 하위메뉴 바로가기 하단 바로가기

Completed Hydrogen Market Assessment with Jacobs (23.02)

관리자   /   2021-03-10

Completed Hydrogen Market Assessment with Jacobs (23.02)




Jacobs, an engineering services firm based in Texas, US, has been contracted by ELENERGY, a South Korean offshore wind farm project developer, to conduct a feasibility study for a new green hydrogen production and import facility in South Korea.

The new facility will be powered by 100% renewable wind energy from a 1.5GW propulsion offshore wind farm currently under development by ELENERGY.

 

Under the contract, Jacobs conducted a green hydrogen market analysis and technical review, developed a conceptual design, and performed a business case assessment for the installation of the facility.

go top
ELENERGY|CEO : Seung Han|#4336, 43F Three(3) IFC, 10 Gukjegeumyung-ro, Yeongdeungpo-gu, Seoul, Republic of Korea|C.R.N : 193-87-01791
E-Mail : sjkim@elenergy.co.kr|Phone : +82 51 266 7210 |FAX : +82 51 266 7215

©ELENERGY Inc. All Rights Reserved.