Completed Transmission line construction feasibility study with Youngin Energy Solution (22.04)

관리자   /   2021-03-10

Completed Transmission line construction feasibility study for grid-connected facilities with Youngin Energy Solution (22.04)



The major risks and feasibility assessment report was completed on April 27, 2022, in collaboration with Youin Energy Solution. The purpose of this assessment is to evaluate the feasibility of constructing a transmission line system by reviewing the configuration of transmission lines, transmission capacity, and scale, selection of tower types, determination of suitable locations for transmission route, identification of potential public concerns, and conducting an economic evaluation.